PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued grading soil along foundation walls Facing South-East (800x600).jpg Drilled holes at the Shear walls prepping for the slab on deck Facing East (800x600).jpg Installed metal decking at 4th Floor Facing East (800x600).jpg Installed trench drains at Rooms 141, 142, 145. Facing West (800x600).jpg Main steel column at the Monumental Stairs Facing West  (800x600).jpg
Previous pageNext page Drilled holes at the Shear walls prepping for the slab on deck Facing East (800x600)
Drilled holes at the Shear walls prepping for the slab on deck Facing East (800x600)